waxwings internal blockwork
| dining room and kitchen |
Scaffolding will be erected tomorrow at Waxwings, allowing Stuart and Bill (the bricklayers) to work above head height safely.
Until then, internal blockwork continues giving a sense of what the building will look like inside.
The intention is to fill the floor cavity with underfloor heating pipes, insulation and then a final screed.
![]() |
| pantry |
| linen store, corridor to bedrooms, store on right |
